Wiki · 22 articles
Structural inspection and NDT, explained
How bridges and buildings are inspected and tested: visual inspection, defects and condition ratings, the non-destructive test methods for concrete and steel, monitoring and the inspection report.
Browse by section
Start here
What inspection is for, the kinds of inspection and how one runs.
- What structural inspection is forWhy structures are inspected, what an inspector looks for, and where non-destructive testing fits.
- Types of inspectionInitial, routine, in-depth, damage, special, underwater and nonredundant steel tension member inspections, and when each is done.
- How an inspection runs, from desk study to reportThe steps of a structural inspection: records, planning, access, visual inspection, testing, analysis and the report.
Defects and condition
What goes wrong in concrete and steel, and how condition is rated.
- Concrete defects and what they meanCracks, spalls, delamination, efflorescence, rust staining, scaling and alkali-silica reaction: how to recognize them and what usually causes them.
- Steel defects: corrosion, fatigue cracks and connectionsCorrosion and section loss, fatigue cracks at details, distortion, and the problems found at bolts, rivets, welds and bearings.
- Condition ratings: NBI 0 to 9 and element condition statesThe two rating systems used on U.S. bridges, what each number means, and how they are used to plan work.
- The National Bridge Inspection StandardsThe federal rules for inspecting bridges on public roads: who must inspect, how often, who is qualified and what gets reported.
- Visual inspection and accessHow to inspect by eye systematically, the simple tools that make it reliable, and the ways to reach the parts of a structure you need to see.
Concrete test methods
Strength, uniformity, cover, rebar, delamination and corrosion.
- Rebound hammerHow the rebound hammer works, what it measures (surface hardness, not strength), and how to use it properly to compare areas of concrete.
- Ultrasonic pulse velocitySending an ultrasonic pulse through concrete to check uniformity, find voids and cracks, and estimate quality.
- Cover meters and rebar locatingFinding reinforcing bars and measuring the concrete cover with electromagnetic cover meters, before coring, drilling or assessing durability.
- Ground-penetrating radarHow GPR maps reinforcement, tendons, voids and deterioration in concrete, and what the hyperbolas on the screen mean.
- Half-cell potential and corrosion testingMeasuring the probability of active reinforcement corrosion with a half-cell, and the related tests: chlorides, carbonation and resistivity.
- Sounding, chain drag and impact-echoFinding delaminations by sound: hammer sounding and chain drag on the surface, and impact-echo to measure thickness and find flaws.
- Cores and other destructive checksWhen to take cores, how many, how they are tested for strength, and what else a core can show.
Steel and weld test methods
Thickness, cracks and weld quality.
- Ultrasonic testing of steel and weldsMeasuring remaining thickness with an ultrasonic gauge and finding flaws inside welds and plates with pulse-echo and phased-array testing.
- Magnetic particle and dye penetrant testingTwo simple surface methods for finding cracks in steel: magnetic particle for ferromagnetic steel, dye penetrant for any non-porous material.
- Radiography (X-ray and gamma)Imaging the inside of welds and concrete with X-rays or gamma rays: what it shows, how it is done, and the radiation safety it requires.
Choosing, monitoring and reporting
Picking a method, monitoring over time, writing it up, and who may do it.
- Choosing a test methodA question-first guide to picking NDT methods: what you need to know, the material, access, and how methods combine.
- Structural health monitoringSensors left on a structure to measure movement, strain, cracks, vibration and environment over time, and how monitoring complements inspection.
- Writing an inspection reportWhat an inspection report contains, how to present defects and test results so they can be compared next time, and how to write recommendations owners act on.
- Who may inspect and test: qualificationsThe qualifications for bridge inspectors, NDT technicians and special inspectors, and why they matter for a report to be accepted.
Equipment library
26 instruments and tools and what each one is for.
Glossary
32 terms and abbreviations, each with a plain definition.
For learning only, not engineering advice. Inspections, test methods and their interpretation belong to qualified, certified people working to the standards and the owner's procedures that apply.