Browse Structural inspection

Cover meters and rebar locating

Last verified November 25, 2026

In one sentence: a cover meter uses a magnetic field to locate reinforcing bars under the surface and estimate how deep they are, which tells you about durability and where it's safe to drill or core.

A cover meter scanning across bars and a cover map
Scan in two directions to map bars and their cover.

How it works

The probe creates an electromagnetic field; steel bars change it. The instrument shows when the probe is over a bar and estimates the cover (the concrete depth to the bar). Some instruments also estimate bar diameter. Guidance is in BS 1881-204 and ACI 228.2R.

Doing it

  1. Calibrate or check the instrument on a known block.
  2. Scan in one direction to find the outer layer of bars and mark them. Then scan across them to find the second layer.
  3. Record cover at a grid of points; good instruments store a map.
  4. Confirm a few points by drilling a small hole or at an existing spall.

Why cover matters

Limits

  • Accuracy drops with depth (typically good to around 100 mm, about 4 inches) and with closely spaced bars or several layers.
  • Doesn't detect non-magnetic reinforcement such as stainless or fiber-reinforced bars well.
  • For deep bars, dense reinforcement or post-tensioning ducts, use Ground-penetrating radar.

Common mistakes

  • Assuming bar diameter from the meter without confirming.
  • Scanning only one direction and missing the second layer.
  • Coring on a meter scan alone near post-tensioning tendons.

For learning only, not engineering advice. Inspections, test methods and their interpretation belong to qualified, certified people working to the standards and the owner's procedures that apply.