Wiki / Structural inspection / Equipment library
Equipment library
The instruments and tools used to inspect and test structures, what each one measures, the standard it is usually run to and the article that explains it.
Visual and access Seeing, measuring and reaching the structure
Instrument or tool What it is for Standard Article
Crack width gauge Measures crack widths against printed lines ACI 224.1R Read Sounding hammer Finds hollow, delaminated concrete and loose bolts by sound ASTM D4580 Read Chains for chain drag Sounding large deck areas quickly ASTM D4580 Read Borescope Looks inside cavities, ducts and box members through small openings Read Under-bridge inspection truck Reaches the underside of a bridge from the deck Read Inspection drone Overall views and hard-to-reach surfaces, to target close inspection Read
Concrete Strength, uniformity, cover, rebar and corrosion
Instrument or tool What it is for Standard Article
Rebound hammer Surface hardness of concrete, for comparing areas ASTM C805 Read UPV tester Pulse velocity through concrete: uniformity, voids, cracks ASTM C597 Read Cover meter Locates bars and measures concrete cover BS 1881-204 Read GPR scanner Maps bars, tendons, voids and deck deterioration ASTM D6087 Read Half-cell and voltmeter Probability of active rebar corrosion ASTM C876 Read Resistivity meter How easily corrosion currents flow in concrete AASHTO T 358 Read Impact-echo device Thickness and internal flaws from one side ASTM C1383 Read Core drill Takes cores for strength and lab tests ASTM C42 Read Phenolphthalein indicator Shows carbonation depth on a fresh break or core Read
Steel and welds Cracks, thickness and weld quality
Instrument or tool What it is for Standard Article
Ultrasonic thickness gauge Remaining thickness of corroded steel ASTM E797 Read Flaw detector (UT, PAUT) Internal flaws in welds and plates AWS D1.1 / D1.5 Read Magnetic yoke and particles Surface cracks in ferromagnetic steel ASTM E709 Read Dye penetrant kit Surface-breaking cracks in non-porous materials ASTM E165 Read Radiography source and detector Images inside welds and members ASTM E94 Read Coating thickness gauge Dry film thickness of paint on steel SSPC-PA 2 Read
Monitoring Instruments left on the structure
Instrument or tool What it is for Standard Article
Crack meter Measures crack opening over time Read Strain gauge Strain in a member under load Read Tiltmeter Rotation of a pier, wall or column Read Accelerometer Vibration and dynamic response Read Data logger with cellular link Reads sensors and sends data online Read
Nothing matches.