Browse Structural inspection

Radiography (X-ray and gamma)

Last verified November 25, 2026

In one sentence: radiography passes X-rays or gamma rays through a part onto a film or a digital detector; denser or thicker material absorbs more, so voids, cracks and hidden objects show up as differences in the image.

Source, object and detector in a radiographic test, with the exclusion zone
The image shows what absorbs more or less radiation along the beam.

How it works

A source (an X-ray tube or a gamma isotope such as iridium-192 or cobalt-60) is placed on one side, a film or digital detector on the other. The image is a shadow of everything along the path. A void, porosity or slag in a weld absorbs less and shows darker on film; a dense inclusion shows lighter. Image quality indicators placed on the part show that the image is sharp enough.

Uses

  • Welds: porosity, slag, lack of fusion, cracks oriented along the beam, in pipes, plates and structural welds. Codes like AWS D1.1 and ASME give acceptance criteria. ASTM E94 is a general guide.
  • Concrete: locating bars, tendons and ducts and checking grout in post-tensioning ducts, in members thin enough to penetrate.
  • Castings and components.

Digital radiography

Computed radiography (imaging plates) and direct digital detectors replace film in much field work: faster results, image enhancement and electronic storage.

Radiation safety

Radiography is the NDT method with the most serious safety requirements:

  • Only licensed operators and radiation safety officers, under a state radioactive material or X-ray license.
  • A controlled exclusion zone with barriers, signs and survey meters, often at night or when the area can be cleared.
  • Personal dosimeters for every radiographer.
  • Secure storage and transport of gamma sources.

Limits

  • Cracks show only when they line up with the beam.
  • Access to both sides is needed.
  • Site disruption from the exclusion zone; often UT is chosen instead for welds.

Common mistakes

  • Scheduling radiography during working hours on a busy site.
  • Concluding "no cracks" from radiographs when cracks may run across the beam.
  • Missing image quality indicators on the images.

For learning only, not engineering advice. Inspections, test methods and their interpretation belong to qualified, certified people working to the standards and the owner's procedures that apply.