Procore for electrical contractors, explained
An independent, practical guide to using Procore on Caltrans and public electrical jobs: setup, daily field work, RFIs, submittals, changes, billing, closeout and rollout for a small GC.
Browse by section
Start here
What Procore is, and whether it fits a small electrical GC.
- What Procore is and who it is forThe construction management platform in plain words: the tools, who uses them, and which ones a small electrical GC actually needs.
- Is Procore worth it for a small electrical GC?When Procore pays off, when a lighter setup is enough, and the questions to answer before you decide.
Setting up
Company, project, drawings, specs and the crew.
- Company setup: directory, permissions and cost codesThe company-level setup that every project inherits: people and companies, permission templates, and a cost code structure that matches Caltrans bid items.
- Setting up a Caltrans project in ProcoreCreating the project with the contract data, the team and the tools a Caltrans electrical job needs, and what to leave off.
- Drawings and specifications in ProcoreUploading plan sets and revisions, keeping the field on the current sheet, and handling Caltrans specification books.
- Bringing your field crew on boardWhat each foreman needs to learn first, how the app works with poor signal, and how to get daily use instead of end-of-week catch-up.
Daily field work
Daily log, photos, time and inspections.
- The Daily Log and Caltrans daily reportsHow the Daily Log sections map to what a Caltrans daily report must show, and how to avoid entering the same day twice.
- Photos that hold up laterTaking and organizing job photos in Procore so underground work, before-and-after conditions and changes can be found and proven.
- Timesheets, crew hours and certified payrollEntering crew hours by cost code and classification in Procore, and what still has to happen in payroll to produce certified payroll.
- Inspections and observationsChecklists for trenches, pull boxes, foundations and pre-energization, and turning a failed item into an observation someone must fix.
Office workflows on a Caltrans job
RFIs, submittals, changes, costs and billing.
- RFIs in ProcoreThe RFI workflow in Procore: RFI manager, assignees, ball in court, official response, and how it fits Caltrans RFI practice.
- Submittals in ProcoreBuilding the submittal register from the special provisions, workflows and ball in court, revisions, and how to keep pace with the RE.
- Change events and change ordersFrom a field conflict to a contract change order in Procore: change events, quotes from subs, potential change orders and the tiers.
- Budget, commitments and subcontractsSetting up the budget by bid item, writing subcontracts and purchase orders as commitments, and reading budget versus cost each month.
- Progress billing and retentionOwner invoices and subcontractor invoices in Procore, retention, and how to line them up with Caltrans progress estimates.
- Meetings, correspondence and the scheduleKeeping meeting minutes, letters to the RE, notices and the schedule in Procore so the record is complete and searchable.
Closeout and records
Punch list, closeout documents and keeping your data.
- Working the punch listPunch items with a punch item manager, assignees and a final approver, created from the phone and closed with photos.
- Building the closeout package as you goCollecting as-builts, O&M manuals, warranties, test reports and certificates in Procore during the job, not after it.
- Keeping your records after the jobWhat to export from Procore at closeout and before a subscription changes, and how to keep it for audits and claims.
Choosing and rolling out
Adoption plan, integrations and what to ask before signing.
- Rolling out Procore in 90 daysAn adoption order for a small electrical GC: which tools first, who learns what, and how to know it is working.
- Integrations an electrical GC asks aboutAccounting, payroll and certified payroll, scheduling, estimating and storage: what exists in Procore's marketplace and what to check before connecting.
- Questions to ask before signingThe contract, data, support and training questions a small contractor should settle before committing to Procore or any construction platform.
Tools at a glance
23 tools and what each one is for.
Glossary
29 terms and abbreviations, each with a plain definition.
Procore is a registered trademark of Procore Technologies, Inc. InfraStatera is not affiliated with or endorsed by Procore. An independent guide written from Procore's public help pages: features change, so Procore's own help is the reference.