Browse Procore guide

Integrations an electrical GC asks about

Based on Procore's public help pages, November 2026Last verified November 25, 2026

In one sentence: Procore connects to many other systems through its App Marketplace, but every integration is a project of its own, so connect only what removes real double entry.

Procore in the middle of the other systems it can connect to
Accounting, payroll, compliance, scheduling and storage around the project.

The usual candidates

NeedWhat to look for
Accounting / ERPSync of vendors, commitments, invoices and costs with your accounting system
PayrollExport of approved timesheets by worker, classification and cost code
Certified payroll / labor complianceApplications that collect certified payroll, check rates and track compliance; several are listed in the marketplace
SchedulingImport of your schedule (for example from scheduling software)
Estimating and takeoffBringing the bid's items and quantities into the budget
StorageSync with the file storage the office already uses

Procore's own pages mention a marketplace of 500+ integrations and apps; availability and features change, so check the current listing.

Questions before connecting anything

  1. Which double entry does it remove, and how many hours a month is that?
  2. Which way does data flow, and which system is the master for each record?
  3. Who supports it: Procore, the other vendor, or a partner?
  4. What does it cost, on both sides?
  5. What happens when it fails: who notices, and how do you fix it?

For a small GC

Start with none. Run the core tools for a few months, then add the one integration that saves the most time, usually accounting or payroll.

Certified payroll note

On California public works, certified payroll must be filed electronically with DIR, with the right prevailing wage rates and fringes. Whatever tool you use must produce that, and someone must still check it. See Certified payroll.

In Procore's own help

Procore App Marketplace. Procore's help pages are the reference for how each screen works today.

Common mistakes

  • Connecting accounting on day one, before cost codes are stable.
  • Two systems both treated as the master for vendors.
  • No one responsible for watching sync errors.

Procore is a registered trademark of Procore Technologies, Inc. InfraStatera is not affiliated with or endorsed by Procore. An independent guide written from Procore's public help pages: features change, so Procore's own help is the reference.