In one sentence: an inspection is a checklist you fill on site; an observation is an issue assigned to someone to fix; a failed checklist item should become an observation.

From a failed checklist item to a closed observation
Check, flag, assign, fix, verify.

Inspections

  • Built from templates: company-level ones you reuse on every project, project-level ones for special cases.
  • Each item is answered (for example pass, fail, not applicable), with notes and photos.
  • Best done on the phone, on site, as the work is checked.

Observations

  • An issue with a description, location, photos, a type (quality, safety, and so on), an assignee and a due date.
  • Created from an inspection's failed item (it keeps a link to the inspection), from a photo, from a drawing location, or on its own.
  • The assignee responds, the creator verifies and closes.

Checklists worth building for electrical work

ChecklistExamples of items
Trench before backfillDepth and cover, conduit type and size, bends, separation, warning tape, tracer wire, bedding
Pull box setType and size, grade, location vs plans, grounding, conduit entries, lid marking
Foundation before pourAnchor bolts and template, conduits, rebar, dimensions, approved mix
Pre-energizationMegger and continuity results, labeling, grounding, torque, panel schedule
Daily safety walkTraffic control, trench protection, PPE, housekeeping

Use the specification's acceptance criteria and your quality plan for the item wording. See Electrical testing and Grounding and bonding.

PM notes

Checklists are proof that work was checked before it was covered. Keep them short enough to be filled every time.

In Procore's own help

Create an observation from an inspection · Create an observation. Procore's help pages are the reference for how each screen works today.

Common mistakes

  • Checklists too long to finish on site.
  • Failed items noted but never assigned.
  • Observations closed without a photo of the fix.