Browse Procore guide

Company setup: directory, permissions and cost codes

Based on Procore's public help pages, November 2026Last verified November 25, 2026

In one sentence: set up the company once (who's who, what each role may do, and how costs are coded) and every new project starts clean.

Company setup feeding every project
Directory, permission templates and cost codes, set once.

The company directory

Add your employees and the companies you work with: suppliers, subs, the agency's people if they'll be invited. Each person is a contact; each person who logs in is a user with a permissions template.

Permission templates

Procore gives each tool a permission level: None, Read Only, Standard or Admin, with extra granular permissions on some tools. A permissions template bundles those levels for a role, so you assign a role, not 40 settings. Templates can be global (any project) or project specific.

A starting set for a small electrical GC:

TemplateTypical use
PM / Project EngineerAdmin on RFIs, Submittals, Change Events, Drawings; Standard elsewhere
Superintendent / ForemanStandard on Daily Log, Photos, Inspections, Punch List, Timesheets; Read Only on Drawings and Specs
AccountingAdmin on financial tools; Read Only elsewhere
SubcontractorRead Only on Drawings and Specs; Standard on their RFIs, submittals and punch items

Be careful with Admin on the Directory tool: Procore's help pages note that it grants Admin on every tool of the project or company.

Cost codes

Procore's financial tools use a work breakdown structure built from codes. On Caltrans unit-price jobs, the most useful structure follows the bid items: one code per item (or per group of items), so budget, costs, change orders and progress billing line up with the RE's estimate.

Templates worth building early

PM notes

Keep the first version small. Add a template when someone needs it twice, not before.

In Procore's own help

What are permissions in Procore · Create a project permissions template. Procore's help pages are the reference for how each screen works today.

Common mistakes

  • Giving everyone Admin "to make it work".
  • Cost codes that don't match the bid items, so billing becomes a translation exercise.
  • Building twenty templates before the first project starts.

Procore is a registered trademark of Procore Technologies, Inc. InfraStatera is not affiliated with or endorsed by Procore. An independent guide written from Procore's public help pages: features change, so Procore's own help is the reference.