Grounding and bonding
In one sentence: grounding gives fault current and lightning a safe path to earth; bonding ties all the metal together so nothing becomes energized.
What gets grounded and bonded
- Service equipment and cabinets, through ground rods and a ground bar.
- Metal poles, through their foundations.
- Metal pull box covers and conduit.
- Equipment inside cabinets, to the cabinet ground bar.
- Surge protection devices. See Surge protection.
Materials
| Item | What it is for |
|---|---|
| Ground rods | Connect the system to earth |
| Grounding and bonding conductors | Tie metal parts together |
| Ground bars | Common point in a cabinet |
| Clamps and connectors | Approved connections, sometimes exothermic welds |
Testing
Ground resistance is measured and must meet the value in the specifications. See Electrical testing.
PM notes
Grounding is one of the most common acceptance findings. Have the crew photograph connections before they are buried or covered. See Phase 10: Caltrans acceptance testing.
Common mistakes / what Caltrans actually checks
- Ground rods missing at a foundation or pull box where the details require them.
- Metal covers not bonded.
- No photos of buried connections.