Battery backup systems
In one sentence: a battery backup system (BBS) keeps a signal or cabinet running for a time when utility power fails.
Main parts
| Item | What it is for |
|---|---|
| Inverter and charger | Switches to battery power and recharges afterward |
| Batteries | Stored energy, sized for the required run time |
| Transfer switch / bypass | Lets maintenance bypass the system |
| Enclosure or cabinet space | Houses the system, sometimes beside the controller cabinet |
| Alarms | Report power failure and battery status |
How it works
When utility power drops, the system transfers to battery. Depending on the specification, a signal may run normally for a time, then switch to flashing operation to stretch the battery.
Testing
Pull the utility power and confirm the transfer, run time and alarms.
PM notes
Check battery shipping and storage rules, and record the battery install date; batteries have a service life and warranty that start then.
Common mistakes / what Caltrans actually checks
- Alarms not wired to the TMC.
- Batteries stored too long before installation.