Browse Caltrans electrical

Highway lighting

Verify the edition named in your contractNot yet verified against the current edition

In one sentence: highway lighting puts light where drivers need it at night: interchanges, ramps, signs and underpasses.

A lighting standard, sign lighting and soffit lighting at night
Roadway, sign and soffit lighting.

Main parts

PartWhat it does
Lighting standards and armsHold the luminaires. See Foundations: cabinet, pole and sign
LuminairesLED fixtures; type and distribution set by the contract
Sign lightingLights overhead guide signs when required
Soffit lightingLights underpasses and structures
Circuits and servicePower from the service through the lighting circuits. See Service equipment and utility power
ControlsPhotocells or controllers that switch lights on at dusk

How it is built

Conduit and pull boxes, foundations, poles and arms, conductors, luminaires, then circuit tests and a night check.

PM notes

  • Lighting poles near traffic may need breakaway bases; follow the details.
  • Check voltage drop on long circuits matches the design; conductor size comes from the plans.
  • Do a night inspection before acceptance: every luminaire lit and aimed.

Common mistakes / what Caltrans actually checks

  • Wrong luminaire distribution type installed.
  • Photocells facing the wrong way or covered.
  • No night check before acceptance.

For learning only. Not affiliated with or endorsed by Caltrans, and not a contract interpretation: always refer to the contract documents for your project.