Browse Caltrans electrical

Vehicle detection

Verify the edition named in your contractNot yet verified against the current edition

In one sentence: detection tells signals, ramp meters and the TMC where vehicles are and how traffic is moving.

Inductive loop, magnetometers, video detection and radar on a two-lane road
Four ways to detect vehicles.

Types

TypeHow it worksNotes
Inductive loopsWire loops cut into the pavement; a vehicle changes their inductanceSaw cutting and sealant; sensitive to pavement work
MagnetometersSmall in-pavement sensors that sense the vehicle's magnetic fieldOften wireless to a nearby receiver
Video detectionCameras with software that detects vehicles in zonesAiming and zone setup matter
RadarPole-mounted sensors that measure presence or speedUsed for counts and speeds on freeways

The contract names the type and the layout on the plans.

What the contractor installs

Loops or sensors, lead-in cable to the cabinet, detector cards or processors in the cabinet, and the setup (sensitivity, zones). See Conductors and cables.

Testing

Loops are tested for inductance and insulation; every detector must report correctly to the controller or the TMC. See Phase 9: System testing.

PM notes

Coordinate loops with paving: cut loops in new pavement only when the schedule allows, and protect existing loops during other work.

Common mistakes / what Caltrans actually checks

  • Loops cut before final paving and then paved over.
  • Lead-in cables not labeled by lane.
  • Video zones set but never verified in real traffic.

For learning only. Not affiliated with or endorsed by Caltrans, and not a contract interpretation: always refer to the contract documents for your project.