Browse Caltrans electrical

Materials library

Every material ordered on a typical Caltrans electrical job, what it is for, the phase it is installed in and the article that explains it. Everything supports one of four systems: civil, electrical, communications or power.

Civil Conduit, boxes, foundations and structures

MaterialWhat it is forPhaseSpecArticle
PVC conduit (Schedule 40/80)Pathway for conductors and fiber, usually undergroundPhase 2Section 86Read
Rigid steel conduitPathway where more protection is needed: exposed runs, structures, some crossingsPhase 2Section 86Read
Elbows (22.5°, 45°, 90°)Change the direction of a conduit runPhase 2Section 86Read
CouplingsJoin conduit sectionsPhase 2Section 86Read
Expansion fittingsLet conduit move with temperature, for example on bridgesPhase 2Section 86Read
Bell ends and bushingsProtect cables where conduit enters a boxPhase 2Section 86Read
Pull tape (mule tape)Left in conduit to pull cable laterPhase 2Section 86Read
Tracer wireLets locators find non-metallic conduit from the surfacePhase 2Section 86Read
Warning tapeBuried above conduit to warn the next excavatorPhase 2Section 86Read
Sand bedding or slurryProtects conduit from rocks and point loadsPhase 2Section 86Read
Pull boxesUnderground access points for pulling and servicePhase 3Section 86Read
Polymer concrete boxesLighter, corrosion-resistant pull boxesPhase 3Section 86Read
Pull box coversSecure the opening; marked for the systemPhase 3Section 86Read
Pull box extensionsAdd depth to a pull box where neededPhase 3Section 86Read
Drain rockLets water drain under a pull boxPhase 3Section 86Read
Anchor boltsAttach poles and cabinets to their foundationPhase 3Section 86Read
Anchor bolt templatesSet the bolt pattern during the pourPhase 3Section 86Read
RebarReinforces concrete foundationsPhase 3Section 86Read
Sonotubes and formsShape foundations above groundPhase 3Section 86Read
ConcreteFoundations, pull box surrounds and encasement; keep the ticketsPhase 3Section 90Read
Signal and lighting standardsPoles that hold heads, luminaires and armsPhase 4Section 87Read
CCTV and communication polesRaise cameras and antennas for a clear viewPhase 4Section 87Read
Mast armsExtend signal heads over the roadPhase 4Section 87Read
Pole caps and handholesSeal the pole top; give access to wiring insidePhase 4Section 87Read

Electrical Cabinets, power, grounding and field devices

MaterialWhat it is forPhaseSpecArticle
Equipment cabinetsHouse the field electronicsPhase 4Section 86Read
Cabinet bases and risersInterface between the foundation and the cabinetPhase 4Section 86Read
Door switchesAlarm the TMC when a cabinet is openedPhase 6Section 86Read
Fans, vents and thermostatsKeep cabinet electronics coolPhase 6Section 86Read
Cabinet heatersPrevent condensationPhase 6Section 86Read
Surge protective devicesDivert spikes on power and data lines to groundPhase 6Section 86Read
Power conductorsCarry power from the service to cabinets and devicesPhase 5Section 86Read
Grounding conductorsBond equipment, poles and boxes togetherPhase 5Section 86Read
Ground rodsConnect the system to earthPhase 3Section 86Read
Ground barsCommon grounding point in a cabinetPhase 6Section 86Read
BreakersProtect each circuitPhase 6Section 86Read
Disconnect switchesSafely isolate powerPhase 6Section 86Read
Terminal blocksWhere field wiring lands in the cabinetPhase 6Section 86Read
Signal cableMulti-conductor cable from the cabinet to signal headsPhase 5Section 87Read
Detector lead-in cableFrom loops or sensors to the cabinetPhase 5Section 87Read
Signal headsVehicle and pedestrian indicationsPhase 6Section 87Read
Pedestrian push buttonsCall a pedestrian phasePhase 6Section 87Read
ControllersRun signal or ramp meter timingPhase 6Section 87Read
Inductive loopsDetect vehicles from wire cut into the pavementPhase 6Section 87Read
LuminairesLight fixtures on standards, signs and structuresPhase 6Section 87Read
PhotocellsSwitch lighting on at duskPhase 6Section 87Read

Communications Fiber, network equipment, cameras and signs

MaterialWhat it is forPhaseSpecArticle
InnerductSubdivides a conduit and protects fiberPhase 2Section 87Read
VaultsLarge boxes for splice closures and many conduitsPhase 3Section 87Read
Fiber optic cableBackbone and distribution of data to the TMCPhase 5Section 87Read
Splice closuresProtect fiber splices in vaults and boxesPhase 7Section 87Read
Splice traysHold and organize individual splicesPhase 7Section 87Read
Fiber patch panelsTerminate fibers in the cabinetPhase 7Section 87Read
Fiber jumpersConnect patch panels to equipmentPhase 7Section 87Read
Ethernet switchesConnect devices in the cabinetPhase 6Section 87Read
Fiber switchesConnect the cabinet to the fiber networkPhase 6Section 87Read
SFP modulesPlug-in transceivers between a switch port and fiberPhase 6Section 87Read
Cellular routersWireless link where there is no fiberPhase 6Section 87Read
AntennasCellular or radio signal for the routerPhase 6Section 87Read
CAT6 cable and patch cordsEthernet to devices and inside cabinetsPhase 5Section 87Read
CCTV camerasLet the TMC watch the highwayPhase 6Section 87Read
Video encodersTurn camera video into network streamsPhase 6Section 87Read
Changeable message signsShow messages sent from the TMCPhase 6Section 87Read
Network radiosWireless links between field sitesPhase 6Section 87Read
Radar and video detectorsDetect vehicles without cutting pavementPhase 6Section 87Read

Power Utility service, solar and batteries

MaterialWhat it is forPhaseSpecArticle
Service equipmentUtility connection, meter, main disconnectPhase 1Section 86Read
Solar panelsGenerate power at remote sitesPhase 4Section 87Read
Solar panel mountsSupport and tilt the panelsPhase 4Section 87Read
Charge controllersRegulate battery chargingPhase 6Section 87Read
LiFePO4 batteriesStore energy for night and cloudy daysPhase 6Section 87Read
Battery enclosures and traysHold and protect batteriesPhase 6Section 87Read
Battery cablesConnect the battery bankPhase 6Section 87Read
DC disconnectsIsolate the battery bank for maintenancePhase 6Section 87Read
Battery backup systems (BBS)Keep a signal or cabinet running during an outagePhase 6Section 87Read
UPS unitsShort backup power inside a cabinetPhase 6Section 87Read

For learning only. Not affiliated with or endorsed by Caltrans, and not a contract interpretation: always refer to the contract documents for your project.