In one sentence: a foundation is the concrete base a pole or cabinet bolts onto, and it has to be right the first time.

Types

  • Pole foundations for signal and lighting standards, CCTV and communication poles: usually drilled, reinforced concrete piles.
  • Cabinet foundations: a pad with conduit stubs coming up under the cabinet.
  • Sign and solar foundations as detailed on the plans.

Dimensions and reinforcement come from the Standard Plans: the ES (electrical) series and the project plans.

Materials

ItemWhat it is for
Anchor bolts and templatesHold the pole or cabinet; the template sets the bolt pattern
RebarReinforces the concrete
Forms or sonotubesShape the foundation above ground
ConcreteThe foundation itself; keep the tickets
Ground rod and conductorGrounding as detailed. See Grounding and bonding
Conduit stubsBring the conduits up into the pole or cabinet

Inspection

Cross-section of a pole foundation with reinforcing cage, anchor bolts, base plate, conduit stubs and ground rod
A pole foundation. Everything in it is inspected before the pour.

The inspector checks the excavation, reinforcement, bolt pattern, conduit stubs and grounding before the pour. Concrete must cure before loading. See Phase 3: Pull boxes and foundations.

PM notes

Anchor bolts often come with the poles but are needed weeks earlier. Order them first.

Common mistakes / what Caltrans actually checks

  • Wrong bolt pattern or orientation.
  • Pouring without inspection.
  • Missing a conduit stub.
  • Loading a foundation before it has cured.