Phase 6: Equipment installation

Phase 6Verify the edition named in your contractNot yet verified against the current edition

In one sentence: phase 6 puts the approved equipment in the cabinets and on the poles.

Inside of a field cabinet with fan, power, surge protection, terminal blocks, switch, router, patch panel and battery backup
A typical field cabinet. The equipment depends on the system.

Inside the cabinet

Power supplies, surge protection, terminal blocks, Ethernet and fiber switches, routers, patch panels, and UPS or battery backup systems. See Equipment cabinets, Network equipment: switches, routers, SFPs and cellular and Surge protection.

Power at remote sites

Solar charge controllers, batteries and PV panels. See Solar power and LiFePO4 batteries.

Field devices

Cameras, detection equipment, network radios, sensors and signs. See CCTV cameras and video and Vehicle detection.

PM focus

  • Install only what was approved in the submittal: model numbers must match.
  • Record serial numbers as the equipment is installed; Caltrans will ask for them.
  • Keep the manuals and warranty papers from every box; they go in the closeout package. See Closeout package checklist.

Common mistakes / what Caltrans actually checks

  • Installing a substituted model that was never approved.
  • Throwing away manuals and warranty cards with the packaging.
  • No serial number list.

For learning only. Not affiliated with or endorsed by Caltrans, and not a contract interpretation: always refer to the contract documents for your project.