Browse Caltrans electrical

Pull boxes and vaults

Verify the edition named in your contractNot yet verified against the current edition

In one sentence: a pull box is the buried box with a lid where crews pull, splice and later service the cables.

What they are for

Pull boxes break long conduit runs into lengths that can be pulled, give access at devices, poles and cabinets, and hold slack and splices. Larger vaults hold fiber splice closures and many conduits.

Types and sizes

Caltrans pull boxes come in standard numbered sizes, with covers and details shown on the ES Standard Plans. See Standard Plans: the ES (electrical) series. The project plans show which size goes where. Communication and fiber pull boxes may be larger or specified in the Special Provisions: what they change and why they win.

ItemWhat it is for
Concrete or polymer concrete boxThe body; polymer concrete is lighter and corrosion resistant
Cover (lid)Secures the opening; marking shows the system (for example, electrical or communications)
ExtensionAdds depth where needed
Ground rod and bondingGrounds metal covers and equipment as detailed. See Grounding and bonding
Drain rockLets water drain under the box

Installation notes

Cross-section of a pull box on drain rock with cover, bell ends, cable slack, bonding jumper and ground rod
A pull box set on drain rock. Sizes, covers and grounding come from the ES Standard Plans.
  • Set to grade, on drain rock, with conduit entering as detailed.
  • Use traffic-rated boxes and covers where vehicles can drive over them.
  • Keep boxes clear of dirt; clean them before pulling cable and before acceptance.

PM notes

Pull boxes are often among the first materials needed. Order them with the conduit, and check the plan count against the bid item list.

Common mistakes / what Caltrans actually checks

  • A non-traffic box set where vehicles drive.
  • Boxes full of dirt at acceptance.
  • Wrong cover marking for the system.
  • Metal covers not bonded as detailed.

For learning only. Not affiliated with or endorsed by Caltrans, and not a contract interpretation: always refer to the contract documents for your project.