Browse Caltrans electrical

Electrical quantity takeoff

Last verified November 25, 2026

In one sentence: a good takeoff counts and measures every component on the electrical sheets by system and location, adds what the plans imply but don't show, and checks the totals against the quantity sheets.

A takeoff, item by item
Conduit, boxes, conductors, fiber, foundations, poles, equipment.

Set up before counting

  • Organize the takeoff by bid item and system, then by location (station range, interchange, ramp).
  • Use the same cost codes as your job costing. See Job costing: knowing what each job really made.
  • Keep a list of every plan sheet and mark it when done.

What to take off

ComponentMeasureWatch for
ConduitLength by size, type and method (trench, bore, structure-mounted)Method changes cost far more than length; riser and bend allowances. See Conduit: types, sizes and fittings and Trenching vs. directional boring
Pull boxesCount by type and sizeTraffic-rated boxes, extensions, grounding. See Pull boxes and vaults
Conductors and cablesLength by size and type, run by runSlack at boxes and poles, vertical runs, the number of conductors per run. See Conductors and cables
Fiber optic cableLength by count, splices, terminationsSlack loops, splice closures, testing. See Fiber optic communications
FoundationsCount by typeDepth, rebar, anchor bolts, concrete. See Foundations: cabinet, pole and sign
Poles and standardsCount by typeMast arms, luminaire arms, lead time
EquipmentCount by typeCabinets, controllers, detection, cameras, signs
Removals and modificationsCount and describeExisting systems to keep running

What the plans don't show

  • Slack, waste and splices.
  • Traffic control needed to reach each location.
  • Testing and documentation. See Electrical testing.
  • Temporary systems to keep existing lighting or signals working.

Checking the takeoff

  • Compare your totals with the quantity sheets on the plans; explain every big difference.
  • Have someone else check the largest items.
  • Walk or drive the site if you can: access, existing conditions, conflicts.

PM notes

Save the takeoff with sheet references. When you win, it becomes the material order list and the foreman's quantity budget.

Common mistakes / what Caltrans actually checks

  • Measuring conduit length but not the installation method.
  • No allowance for conductor slack and waste.
  • Trusting the quantity sheets without your own count.

For learning only. Not affiliated with or endorsed by Caltrans, and not a contract interpretation: always refer to the contract documents for your project.