Subcontractor quotes and bid day

Last verified November 25, 2026

In one sentence: bid day is about getting late numbers into a bid that's already built, so organize the sub quotes, the forms and the decisions before the morning, and leave time to check.

Bid day timeline
Quotes in, level, choose, forms, final check, submit.

Subcontractor quotes

Common subs on electrical jobs: traffic control, boring, paving and concrete repair, striping, saw cutting, surveying, trucking.

  • Send each sub the scope, plan sheets and spec sections early.
  • Ask for exclusions, insurance, DIR registration and license.
  • Level quotes by scope: the lowest number often excludes something.

DBE and subcontractor listing

  • If the contract has a DBE goal, plan how you'll meet it or document good faith efforts. See DBE requirements on federal-aid jobs.
  • California's subcontractor listing law requires listing subs above the threshold with their work and location; once listed, replacing them is restricted. See Listing subcontractors.

Before bid day

Bid day

  1. Morning: last sub and supplier quotes arrive; replace plugs.
  2. Level late quotes quickly; confirm scope on the phone if needed.
  3. Final review of totals, markups and big items. See Checking your bid before it goes.
  4. Finish listing and DBE information.
  5. Submit electronically with margin before the deadline. Caltrans allows resubmitting before the opening if you need to correct.

PM notes

Set a cut-off time for quotes well before the deadline. A bid submitted in the last minutes is a bid nobody checked.

Common mistakes / what Caltrans actually checks

  • Using the lowest sub number without checking its exclusions.
  • Listing a sub you haven't confirmed.
  • Submitting with minutes to spare.