As-built
Plans marked with what was actually built, including changes, locations and depths.
BBSBattery Backup System
Keeps a traffic signal or cabinet running for a time during a power outage.
Bid Item List
The list of items in a Caltrans bid with item number, description, unit of measure and quantity, against which bidders enter prices. Read more
Bid summary
Caltrans' published results of a bid opening, with each bidder's total and item prices once verified. Read more
BMPBest Management Practice
A measure that keeps sediment and pollutants out of storm drains during construction, such as fiber rolls, inlet protection or covering stockpiles.
CCOContract Change Order
A written change to the contract, issued by Caltrans, that adjusts the work, the price or the time.
CCTVClosed-Circuit Television
Traffic cameras installed along the highway so the operations center can watch conditions live.
CMSChangeable Message Sign
An electronic sign over or beside the road that shows messages sent from the operations center.
Conduit
Protective pipe that carries conductors and cables, usually buried.
Contract Cost Data
Caltrans' searchable database of historic bid item prices by year and district. Read more
Cost breakdown
A breakdown of a lump sum bid item into parts, used by the Resident Engineer to pay progress. Read more
CPM scheduleCritical Path Method schedule
The project schedule that links activities in sequence and shows which ones control the finish date.
Crew-day
One crew working one day; quantity divided by production rate gives the crew-days needed. Read more
DBEDisadvantaged Business Enterprise
A certified small business; many Caltrans contracts set a DBE participation goal.
Engineer's estimate
The agency's own estimate of the contract cost, kept confidential until bids are opened. Read more
Force account
Payment for changed work based on actual labor, equipment and materials plus markups, recorded daily and signed by the inspector.
HDDHorizontal Directional Drilling
Installing conduit underground by steering a drill, without an open trench.
Innerduct
Smaller duct installed inside a conduit to organize and protect fiber.
ITSIntelligent Transportation Systems
The field devices and communications that monitor and manage traffic: cameras, detection, message signs, ramp meters and the network that links them.
LiFePO4Lithium iron phosphate
A lithium battery chemistry used at solar-powered sites for its long life and stability.
Luminaire
A complete light fixture on a lighting pole or structure.
Lump sum
A bid item paid as one price for the whole item, regardless of quantity.
Mandrel
A plug pulled through conduit to prove it is clear and round before cable is pulled.
nSSPNon-standard Special Provision
Special provision text written for one project when no standard wording fits.
OTDROptical Time-Domain Reflectometer
An instrument that sends light pulses down a fiber and reads the reflections to locate splices, connectors, breaks and losses along the run.
Plug number
A temporary price in an estimate for an item whose quote hasn't arrived yet. Read more
Potholing
Digging a small hole, often by vacuum excavation, to see the depth and owner of an existing utility.
Production rate
The quantity of work one crew installs per day under given conditions. Read more
PTZPan-Tilt-Zoom
A camera the TMC can move and zoom remotely.
Pull box
A buried box with a lid, placed along conduit runs, where crews pull, splice and later access cables.
Punch list
The list of deficiencies Caltrans finds during inspection and testing, to be fixed before acceptance.
Quote leveling
Comparing quotes item by item and scope by scope so they can be compared fairly. Read more
Ramp meter
A signal on an on-ramp that controls how fast vehicles enter the freeway.
REResident Engineer
The Caltrans engineer in charge of the contract in the field, and the contractor's main point of contact.
RFIRequest for Information
A written question to the engineer when the contract documents are unclear or conflict with each other or with field conditions.
RSPRevised Standard Plan
A Standard Plan sheet revised after the edition was published, included with the contract when it applies.
RSSRevised Standard Specifications
Changes to the Standard Specifications issued after the edition was published.
SFPSmall Form-factor Pluggable
A plug-in transceiver that connects a network switch port to fiber or copper cable.
Special Provisions
The part of a contract that changes and adds to the Standard Specifications for that one project.
Splice closure
A sealed housing that protects fiber splices, usually in a vault or pull box.
SSPStandard Special Provision
Standard wording that designers use to amend the Standard Specifications for a project.
Standard Specifications
The Caltrans rulebook that applies to every contract: how work is done, which materials are acceptable, and how work is measured and paid.
Submittal
Product data, shop drawings or samples the contractor sends for approval before ordering or installing material.
SWPPPStorm Water Pollution Prevention Plan
The storm water plan required on larger projects, under the state's construction general permit.
Takeoff
Counting and measuring the quantities of work and material from the plans. Read more
TMCTraffic Management Center
The Caltrans district center that monitors and controls field devices such as cameras, detectors and message signs.
Unbalanced bid
A bid where some unit prices are far above and others far below their real cost. Read more
Working day
A day counted against the contract time, as defined in the specifications.
WPCPWater Pollution Control Program
The contractor's plan for keeping sediment and pollutants out of storm drains on smaller projects; larger ones need a SWPPP.