Browse Caltrans electrical
Glossary
- As-built
- Plans marked with what was actually built, including changes, locations and depths.
- BBSBattery Backup System
- Keeps a traffic signal or cabinet running for a time during a power outage.
- Bid Item List
- The list of items in a Caltrans bid with item number, description, unit of measure and quantity, against which bidders enter prices. Read more
- Bid summary
- Caltrans' published results of a bid opening, with each bidder's total and item prices once verified. Read more
- BMPBest Management Practice
- A measure that keeps sediment and pollutants out of storm drains during construction, such as fiber rolls, inlet protection or covering stockpiles.
- CCOContract Change Order
- A written change to the contract, issued by Caltrans, that adjusts the work, the price or the time.
- CCTVClosed-Circuit Television
- Traffic cameras installed along the highway so the operations center can watch conditions live.
- CMSChangeable Message Sign
- An electronic sign over or beside the road that shows messages sent from the operations center.
- Conduit
- Protective pipe that carries conductors and cables, usually buried.
- Contract Cost Data
- Caltrans' searchable database of historic bid item prices by year and district. Read more
- Cost breakdown
- A breakdown of a lump sum bid item into parts, used by the Resident Engineer to pay progress. Read more
- CPM scheduleCritical Path Method schedule
- The project schedule that links activities in sequence and shows which ones control the finish date.
- Crew-day
- One crew working one day; quantity divided by production rate gives the crew-days needed. Read more
- DBEDisadvantaged Business Enterprise
- A certified small business; many Caltrans contracts set a DBE participation goal.
- Engineer's estimate
- The agency's own estimate of the contract cost, kept confidential until bids are opened. Read more
- Force account
- Payment for changed work based on actual labor, equipment and materials plus markups, recorded daily and signed by the inspector.
- HDDHorizontal Directional Drilling
- Installing conduit underground by steering a drill, without an open trench.
- Innerduct
- Smaller duct installed inside a conduit to organize and protect fiber.
- ITSIntelligent Transportation Systems
- The field devices and communications that monitor and manage traffic: cameras, detection, message signs, ramp meters and the network that links them.
- LiFePO4Lithium iron phosphate
- A lithium battery chemistry used at solar-powered sites for its long life and stability.
- Luminaire
- A complete light fixture on a lighting pole or structure.
- Lump sum
- A bid item paid as one price for the whole item, regardless of quantity.
- Mandrel
- A plug pulled through conduit to prove it is clear and round before cable is pulled.
- nSSPNon-standard Special Provision
- Special provision text written for one project when no standard wording fits.
- OTDROptical Time-Domain Reflectometer
- An instrument that sends light pulses down a fiber and reads the reflections to locate splices, connectors, breaks and losses along the run.
- Plug number
- A temporary price in an estimate for an item whose quote hasn't arrived yet. Read more
- Potholing
- Digging a small hole, often by vacuum excavation, to see the depth and owner of an existing utility.
- Production rate
- The quantity of work one crew installs per day under given conditions. Read more
- PTZPan-Tilt-Zoom
- A camera the TMC can move and zoom remotely.
- Pull box
- A buried box with a lid, placed along conduit runs, where crews pull, splice and later access cables.
- Punch list
- The list of deficiencies Caltrans finds during inspection and testing, to be fixed before acceptance.
- Quote leveling
- Comparing quotes item by item and scope by scope so they can be compared fairly. Read more
- Ramp meter
- A signal on an on-ramp that controls how fast vehicles enter the freeway.
- REResident Engineer
- The Caltrans engineer in charge of the contract in the field, and the contractor's main point of contact.
- RFIRequest for Information
- A written question to the engineer when the contract documents are unclear or conflict with each other or with field conditions.
- RSPRevised Standard Plan
- A Standard Plan sheet revised after the edition was published, included with the contract when it applies.
- RSSRevised Standard Specifications
- Changes to the Standard Specifications issued after the edition was published.
- SFPSmall Form-factor Pluggable
- A plug-in transceiver that connects a network switch port to fiber or copper cable.
- Special Provisions
- The part of a contract that changes and adds to the Standard Specifications for that one project.
- Splice closure
- A sealed housing that protects fiber splices, usually in a vault or pull box.
- SSPStandard Special Provision
- Standard wording that designers use to amend the Standard Specifications for a project.
- Standard Specifications
- The Caltrans rulebook that applies to every contract: how work is done, which materials are acceptable, and how work is measured and paid.
- Submittal
- Product data, shop drawings or samples the contractor sends for approval before ordering or installing material.
- SWPPPStorm Water Pollution Prevention Plan
- The storm water plan required on larger projects, under the state's construction general permit.
- Takeoff
- Counting and measuring the quantities of work and material from the plans. Read more
- TMCTraffic Management Center
- The Caltrans district center that monitors and controls field devices such as cameras, detectors and message signs.
- Unbalanced bid
- A bid where some unit prices are far above and others far below their real cost. Read more
- Working day
- A day counted against the contract time, as defined in the specifications.
- WPCPWater Pollution Control Program
- The contractor's plan for keeping sediment and pollutants out of storm drains on smaller projects; larger ones need a SWPPP.