Conductors and cables

Verify the edition named in your contractNot yet verified against the current edition

In one sentence: conductors carry power, and cables carry signals and data; both are pulled through the conduit and terminated in cabinets and devices.

Cut ends of a power conductor, a grounding conductor, a signal cable, a CAT6 cable and a fiber optic cable
The main conductor and cable types on a job.

Power conductors

Copper conductors sized and insulated as the specifications and conductor schedule require, from the service to the cabinets and devices. Color coding follows the specifications.

Grounding conductors

Bare or insulated conductors that bond equipment, poles and boxes to the grounding system. See Grounding and bonding.

Signal and communication cables

Installation notes

PM notes

Keep the reel tags and certifications for the submittal and closeout records.

Common mistakes / what Caltrans actually checks

  • Splicing in a location the specifications do not allow.
  • Wrong color coding.
  • Energizing before insulation tests.

For learning only. Not affiliated with or endorsed by Caltrans, and not a contract interpretation: always refer to the contract documents for your project.