Phase 1: Preconstruction and design review

Phase 1Verify the edition named in your contractNot yet verified against the current edition

In one sentence: phase 1 is where you win or lose the schedule: everything you don't catch on paper now becomes a delay in the field later.

Flow from the specifications to a submittal, review, purchase order, delivery and installation
A submittal's path from the specifications to installed material.

What happens

PM checklist

  1. Submittal log built from the specifications.
  2. Long-lead list with supplier quotes and lead times.
  3. RFI log started.
  4. Schedule with procurement activities, not only field work.
  5. Existing-facility conflicts walked in the field, with photos.

Goal: approvals in hand and material on order before the crew needs them.

Common mistakes / what Caltrans actually checks

  • Starting field work before submittals are approved.
  • Ordering long-lead equipment only after the first one is approved, instead of submitting it first.
  • Leaving procurement out of the baseline schedule.
  • Not walking the site before the preconstruction meeting.