Phase 11: Punch list
In one sentence: the punch list is the last quality check before turnover: close every item and get each one signed off.
Typical items
- Missing or wrong labels.
- Damaged equipment or finishes.
- Documentation updates.
- Final adjustments: aiming cameras, timing, settings.
How to run it
- Turn the list into a tracker: item, location, who fixes it, date fixed, date Caltrans accepted.
- Group items by location so the crew can fix them in one trip and one lane closure.
- Photograph each fix.
- Send the updated list to the Resident Engineer and ask for sign-off.
The job isn't accepted until the punch list is closed. See Caltrans acceptance testing and the punch list.
Common mistakes / what Caltrans actually checks
- Fixing items without photos or a written record.
- Sending the crew back for one item at a time.