Phase 11: Punch list

Phase 11Verify the edition named in your contractNot yet verified against the current edition

In one sentence: the punch list is the last quality check before turnover: close every item and get each one signed off.

Flow from your own tests to witness tests, punch list, fixes, acceptance, closeout package and final payment
From testing to final payment.

Typical items

  • Missing or wrong labels.
  • Damaged equipment or finishes.
  • Documentation updates.
  • Final adjustments: aiming cameras, timing, settings.

How to run it

  1. Turn the list into a tracker: item, location, who fixes it, date fixed, date Caltrans accepted.
  2. Group items by location so the crew can fix them in one trip and one lane closure.
  3. Photograph each fix.
  4. Send the updated list to the Resident Engineer and ask for sign-off.

The job isn't accepted until the punch list is closed. See Caltrans acceptance testing and the punch list.

Common mistakes / what Caltrans actually checks

  • Fixing items without photos or a written record.
  • Sending the crew back for one item at a time.