Browse Caltrans electrical

CCTV cameras and video

Verify the edition named in your contractNot yet verified against the current edition

In one sentence: CCTV cameras let the Traffic Management Center see incidents and conditions live and react.

A CCTV camera and a changeable message sign connected by fiber or cellular to the TMC
Field devices report to the Traffic Management Center over fiber or cellular.

Main parts

PartWhat it does
Camera (PTZ or fixed)Pan-tilt-zoom cameras are remotely controlled; fixed cameras watch one view
CCTV pole and mountRaises the camera for a clear view. See Foundations: cabinet, pole and sign
Video encoder (if needed)Converts video to network streams for older or analog cameras
Network equipmentSwitch, fiber or cellular router back to the TMC. See Network equipment: switches, routers, SFPs and cellular
Surge protectionOn power and data at the pole. See Surge protection
PowerUtility service or solar. See Solar power and LiFePO4 batteries

Setup

Cameras get IP addresses and settings from Caltrans, are added to the TMC's video system, and are aimed and given preset views.

Testing

Caltrans checks it can see the stream, control pan-tilt-zoom, and recall presets. See Phase 9: System testing.

PM notes

Confirm camera model, video format and TMC software compatibility at submittal time. A camera the TMC can't read is a failed test.

Common mistakes / what Caltrans actually checks

  • Camera model not compatible with the TMC software.
  • Unprotected data cable up the pole.
  • Presets not set before the witness test.

For learning only. Not affiliated with or endorsed by Caltrans, and not a contract interpretation: always refer to the contract documents for your project.