Surge protection
In one sentence: surge protection diverts voltage spikes to ground before they reach the electronics.
Where it goes
- On the power service and the cabinet's main power input.
- On signal and data lines that leave the cabinet: detector lead-ins, Ethernet to pole-mounted devices, antenna feeds.
- On equipment as the specifications or the manufacturer require.
How it works
A surge protective device connects between the line and ground. It only works if the grounding is good, so it depends on Grounding and bonding.
PM notes
- Submit the devices specified for each location; they differ by voltage and signal type.
- Many devices have a status indicator. Check that they are healthy before acceptance.
Common mistakes / what Caltrans actually checks
- Surge devices installed with long or looped ground leads, which weakens them.
- Data lines to pole-mounted cameras left unprotected.